Oscaruzzo
Member
It's all in the topic :-/
http://www.gp32x.de/board/index.php?/topic/55437-everyone-welcome-me-to-the-family-im-getting-one/page__view__findpost__p__895355TitanUranus said:Are we still on track for that incredible "All first batch Pandora's should be shipped by October" estimate, or was that dumped in the toilet in the few days I've been away?
craigix said:203 boards arriving on Monday with the nubs tested (if UPS don't mess up).
There are 203 cases ready for those boards to go straight in to so they will ship next week too.
Then we hope it's all go go go for Aug/Sept.
Every few hundred we make we improve the build process, this is very important to get right since we plan to use this case and system for a couple of years.
Asteroid said:craigix said:203 boards arriving on Monday with the nubs tested (if UPS don't mess up).
There are 203 cases ready for those boards to go straight in to so they will ship next week too.
Then we hope it's all go go go for Aug/Sept.
Every few hundred we make we improve the build process, this is very important to get right since we plan to use this case and system for a couple of years.
In a couple of years, I wonder what the future (development) may bring!.
How long did the Texas Factory needed to make these 350 boards? In other words, when did they start with these and when did they finish? I just want to do some worst-case-calculations of my own, assuming they are not able to do it quicker for the rest of our life.EvilDragon said:AFAIK, 350 boards or something like that are already finished (including tested nubs) or will be finished shortly.
If we're lucky, something might happen next week, might also be the week after.
But testing and production is continuing and hopefully will speed up soon...![]()
Ah, OK. Thanx.mali said:^ Those "400 boards" were in fact pre nub testing, so an obsolete estimation.