Bosbeetle
Terminally lost
Gruso said:I spat beer on the screen when I saw Ozzy.
She's awesome
Last edited by a moderator:
Gruso said:I spat beer on the screen when I saw Ozzy.
I agree with you, but if Katla has an eruption we won't have any flights in europe for quite some time (several months probably). That would certainly delay everything. It can happen and the latest eruption clearly increased the risc for Katla erupting. We just have to keep our nintendo thumbs crossed. However, as i said, I also think that the chineese factory is our major cause of concern.CodeTwister said:Xenu said:It took aprox. 2 weeks to produce 700 pandoras. Let's say that it takes a month to get the new cases + 10 weeks to assemble the rest. We're looking at 3-4 months without a volcano erupting and 6-12 months if we have a new eruption.
Have I missed something? As far as I know the cases were not ready to ship even AFTER the volcano problem. So in reality, the volcano had no impact on the Pandora release date. Wrong? I guess the upcoming delays will be caused by the factory queue like in the past.
second exodous said:I have an idea, why doesn't the OP team have 200 un-worked cases shipped with a worked-on sample so shipment never slows down. When the sample that comes back as 100% ready for the Chinese company to start pre-working every case then every order from then on will be ordered as pre-worked. I'd just hate to see shipments just stop for weeks and weeks while samples go back and fourth. I'll understand if this is just not feasible for any reason, Chinese can't ship that few or Craig just can't pay people to assemble non pre-worked cases right now, but it's a thought.
mysticmaus said:Xtreme2k said:craigix said:We can't continue the way it is, it takes too long. We spent *DAYS* just sticking on batch labels, bumpers, adhesive strips etc. Not good.
Craig, I believe you that this would save time for the whole project including the second (and maybe third) batch. It will, however, surely not speed up the remaining first batch units because the time for communicating the changes with the chinese, getting samples etc. will be more than the few days you would need to stick on those labels to the 3000 pandoras. You have to understand that I - like probably most of the people who pre-ordered - have no interest in speeding up the next batches. We have waited a really long time and expect you to get _our_ ones out as fast as possible, not further delaying it for your own future interests.
Craig please listen to this post!!! , It sais it all!
But I guess it's already too late...
BadToad said:I envy you all worrying so much about a handheld console/umpc. I just wish that my life was simple enough that the Pandora being later than it should be was of serious importance.
Monk said:second exodous said:I have an idea, why doesn't the OP team have 200 un-worked cases shipped with a worked-on sample so shipment never slows down. When the sample that comes back as 100% ready for the Chinese company to start pre-working every case then every order from then on will be ordered as pre-worked. I'd just hate to see shipments just stop for weeks and weeks while samples go back and fourth. I'll understand if this is just not feasible for any reason, Chinese can't ship that few or Craig just can't pay people to assemble non pre-worked cases right now, but it's a thought.
Apparently, they ran out of boards recently, and MWeston and ED don't go back home until Wednesday/Thursday. Since they supposedly had 1000 cases, this is probably exactly what they will be doing - fixing up the remaining 300 cases ready for new PCBs to arrive. With Craig taking a break Thursday-Sunday inclusive, I don't know if the case fixing will be finished or continue on Monday, but they don't seem to be scratching around looking for something to do.